Insights
Conflicts Vest caught, what changed in your documents, and what the crew keeps asking.
🏗️ Northgate Technology Center
1,283
Pages indexed
Drawings, specs, Addendum 02, RFI log
47▲ 12
Questions this week
Every answer cited — 6 people asking
3
Open conflicts
Documents that disagree — 1 new this week
4
Abstained answers
Vest said “not in the documents” instead of guessing
Needs attention — detected conflicts3 open
Partition stud gauge — drawings vs. specRFI-023 SENT
Drawings say 25 ga, spec says 20 ga minimum. Stud order is on hold.
A9.2.1 · Note CSpec 09 29 00
Jul 1
Door 1121B rated 45-min in a 1-hour stair enclosure
Schedule says 45-min; the stair enclosure needs a 60-min door.
A9.3.1 · Door ScheduleA2.1.2 · Area A Plan
Jul 1
Ceiling plans not reissued after Addendum 02
Addendum runs corridor walls to structure; the ceiling plans still show the old height. Addendum governs.
Addendum 02 · AD-02.1A3.1.1 · RCP
Jul 1
Couldn't answer — missing from your documentsthis week
RTU support steel sizes · asked 2×
No structural sheets in the set — email drafted to the architect.
Jul 1
Elevator cab finishes · asked 1×
Cab finish submittal not uploaded yet.
Jun 29
Irrigation scope at the north lot · asked 1×
Landscape package isn't in this set.
Jun 28
Document activitylast 7 days
Addendum 02 processed
6 changes · 2 sheets superseded — answers now use the new set.
Jul 1
Painting submittal is now stale
Approved against the old paint spec — needs revise & resubmit.
Jul 1
Procore sync — 12 new files
Daily logs and two submittals — indexed and answerable.
Jun 30
RFI log updated — RFI-023 sent
Stud-gauge conflict sent to the architect — answer due Jul 8.
Jul 1
What the team is asking47 questions
Partitions & framing14
Doors & hardware11
Finishes8
Mechanical / RTUs6
Concrete4
Everything else4
Everything here links back to its source documents. Demo data shown.